Program Management
Time Savings:
A master schedule/logistics network is planned after studying various approaches.
When appropriate, IAP can fast track the process, permitting early construction
starts. Materials and equipment with long delivery times are purchased before
construction contracts are awarded and later assigned to a contractor. Effective
PM/CM Depends on Strong Project Control: Strong project control is a key
aspect of IAP's PM/CM services. It is established even before the job starts by
construction personnel who provide independent design reviews and constructability
analyses. Scheduling, based on realistic appraisal of actual construction time
requirements is an important aspect of project control. Another crucial factor,
cost estimating, is centered on a master project budget and cost estimate. Our
PM/CM professionals use frequent updates, projected cost to complete, field surveys,
and quantity take-offs to ensure reliable cost estimates and to avoid cost overruns. Mobilization
and Pre-design · Develop management plan · Develop/verify
budgets · Develop master schedule · Partnering meetings ·
Design QA/QC plan · Recommend contracting strategies · Manage
consultant selection · Assist with educational programming ·
Implement web-based information system · Systems and web site training ·
Document project procedures · Assist with educational programming Construction ·
Conduct pre-construction meetings · Expedite initial contractor meetings ·
Provide onsite representation · Conduct regular project meetings ·
Process shop drawings and submittals · Process requests for clarification ·
Evaluate and process requests for payment · Perform detail construction
scheduling · Maintain project records · Provide change order
and claim management · Prepare regular progress reports ·
Conduct on site inspections · Monitor field lab tests · Ensure
compliance with safety regulations · Coordinate installation of FIFE
Design · Provide design management · Establish
and monitor design schedule · Review of constructability analysis ·
Prepare construction cost estimates · Conduct value engineering studies ·
Identify long-lead procurements · Coordinate phased construction with
staff Procurement · Finalize contract packaging strategy ·
Identify interested contractors · Prequalify contractors ·
Conduct pre-bid conferences · Issue addenda · Evaluate contractor
bids · Prepare recommendations to award · Negotiate contracts Post
Construction and Occupancy · Prepare and expedite punch list ·
Recommend acceptance or rejection of work · Develop occupancy schedule ·
Coordinate system tests · Assemble operations manuals and warranties ·
Assessment of liquidated damages · Final payment, release of retainage |